Civl Engineering
February 2008

Civil Engineering

A publication of the American Society of Civil Engineers

February 2008  |  Volume 78, Number 2

 
Tom Crane Photography, Inc.

ON THE COVER: The newest suspension bridge to cross the Tacoma Narrows, in Washington State, is situated just 55 m from the existing crossing, which was constructed in 1950. The new bridge features an 854 m main span, 154 m tall reinforced-concrete towers, and a deck designed so that a second, lower level can be added to accommodate increases in traffic or light-rail. (Photograph © 2008 The Associated Press)

Features

Crossing the Narrows

 


The design of the new Tacoma Narrows Bridge, in Washington State, benefits not only from the knowledge that has been gained about the aerodynamics of suspension bridges in the years since the first suspension bridge across the narrows collapsed—in 1940 just four months after its opening—but also from the design/build delivery method, which enabled the design team to incorporate innovations in an efficient and cost-effective manner that might not have been possible otherwise.

Modular Mooring

By Markus Wernli, Ph.D., P.E., and Preston S. Springston

To reduce the costs associated with waterfront construction and maintenance, the U.S. Navy has developed an alternative pier—the modular hybrid pier (MHP)—that features a double-deck floating concrete structure. The MHP consists of a series of uniform modules constructed of advanced materials and developed in accordance with the principles of sustainable design.

Capitol Achievement

By Jeff L. Brown

Updating Virginia’s capitol building to meet the needs of a 21st-century government while preserving the historic structure for future generations required a delicate balancing act. The project succeeded not only in renovating and restoring Thomas Jefferson’s original building but also in adding a spacious underground visitors’ center.

Small Footprint, Big Promise

By Thomas E. Vik, P.E., BCEE, and Mark Surwillo

Faced with population growth, increasingly large wet-weather flows, and stricter permit limits on ammonia nitrogen, a Wisconsin wastewater treatment facility adopted ballasted sedimentation for primary treatment and peak flows followed by biological aerated filtration for secondary treatment. Believed to be the first of its kind in the United States, this high-rate configuration requires a fraction of the space that would have been taken up by conventional treatment systems and is expected to handily meet all permit requirements.

 Foster + Partners                                            

 Studio Daniel Libeskind                      carlorattiassociati/Walter
                                                            Nicolino, Carlo Ratti, MIT 
                                                            SENSEable City Laboratory

Civil Engineering News
Gusset plate problems • Crystalline structure • Walls of water • Bridges replaced • Island city • Saving a bay • Permits in jeopardy • Runway reconfigured • Seismic upgrades averted • Observation wheel • News Briefs•

News Briefs
Letters
Policy Briefing
Technology
History Lesson
Editor’s Note
Books
The Law