Instrumental Approach


ABSTRACT ONLY:

Construction at a venerable water treatment plant in Toronto required assurances that existing facilities would experience little to no movement. An extensive monitoring regime incorporated into the project’s design and construction helped to ensure that this challenge would be met.


BIOS:

By Marcelo Chuaqui the general manager, Samantha Ford, a monitoring and field technician, and Ivan Barua, the operations manager for Monir Precision Monitoring, of Mississauga, Ontario; and Matthew Janes, P.Eng., a senior engineer for Isherwood Associates, also of Mississauga.