ABSTRACT ONLY:

Subsidence beneath a transformer at an important Canadian electric power-generating facility required a delicate and precise grouting solution. This successful grouting program, which was conducted within a tight deadline and under several logistical constraints, relied on thorough planning, precision settlement monitoring, accurate control of grout injection, and effective coordination and cooperation among the contractor, consultant, and owners.

BIOS:

By Anthony A. Fuller, P.Eng., the project manager for Golder Associates Ltd., in Ontario, Canada; John Westland, P.Eng, a principal of Golder Associates Ltd.; Paul M. Blakita, M.ASCE, the senior project manager for Hayward Baker, Inc., in Odenton, Maryland; and Vince Tzambazis, a project manager with Ontarior Power Generation.